Mpumalanga local municipality placed under administration in 2009 with no bank reconciliations since 2006; a public-safety manager was arrested in 2025 over a R718 repair invoiced at R85,875.
Loading institution record...
Mpumalanga local municipality placed under administration in 2009 with no bank reconciliations since 2006; a public-safety manager was arrested in 2025 over a R718 repair invoiced at R85,875.
Case themes: Municipal Collapse (1)
One institution on the record. The file it belongs to runs to hundreds.
R14.7 million (roads contract on a letter, NCOP 2009); R85,875 invoice for a R718 repair (2025)