Former Head of Engineering at PRASA. Played a central role in drafting the technical specifications for the Swifambo locomotive tender that resulted in the infamous "tall trains" scandal — locomotives that could not fit through South African rail tunnels. The specifications were found to be defective and possibly tailored to favour a specific manufacturer. Also found to have misrepresented his academic qualifications, falsely claiming a PhD. Arrested on criminal charges.