Darkness
R1 trillion (estimated programme cost — stopped by court)
R500.0 billion
R254 billion
R233 billion
R135-234 billion
R96 billion (combined Medupi/Kusile boiler contracts; ~$5.6B)
R47 billion+
R14.5 billion
R10 billion
R3.7 billion
R2.34 billion (R659M prepayment + R1.68B guarantee)
R2.17 billion
R15 million
Billions (indirect — enabled capture across multiple SOEs)
Connected pain points