Skip to main content
4FactSake
VoorbladJou LêerOndersoekWar RoomSoekSakePersoneInstellings

Stay informed

Get notified when new evidence is published.

4FactSake

'n Soekbare, kruisverwysde openbare databasis van staatsmislukking en korrupsie in Suid-Afrika. Elke bewering gestaaf. Elke persoon gekoppel. Elke verskoning gedokumenteer.

Dit is nie 'n meningsplatform nie. Dit is 'n forensiese rekord. Die feite spreek vir hulself.

Verken

SakePersoneInstellingsDie KwitansieVerskonings

Ondersoek

SoekOndersoekVir Media

© 2026 4FactSake. Alle data openbaar verkry.

MethodologyCorrectionsGebou met bewyse, nie menings nie.
  • NSFAS Fraud Arrests: Eleven in Court Over Shell-Company Diversions — 2026
  • SIU UIF-TERS Crackdown: R27m+ Preserved, Convictions Across Provinces — R27 million+ (preserved/recovered)
  • Durban High Court Sets Aside R7bn KwaZulu-Natal Tender as Unlawful — R7 billion (contract value)
  • Police Infiltration Scandal: Parliament Finds "Serious Institutional Crisis" — 2026
  • PRASA "Tall Trains" Fallout: SARS Links Montana to R30m From Locomotive Contractor — R30 million+ (SARS-traced)
  • National Lotteries Commission: ~R2bn "Good Causes" Looting Probe — R2 billion (alleged)
  • SAPS Medicare24 Tender: R360m Police Health Contract Prosecution — R360 million
  • Vincent Smith: First Bosasa/Zondo State Capture Conviction — 7 Years — R28 million
  • Phala Phala: ConCourt Reopens Impeachment as Ramaphosa Goes to Court to Stop It — 2026
  • Nine Arrested in Eastern Cape Multimillion-Rand Tender Fraud — Multimillion-rand (exact figure not yet public)
  • VBS Accountability: IRBA Permanently Strikes Off KPMG Auditor Sipho Malaba — R1.6m fine + ~R9.2m costs
  • Tshwane Security Contract: R2.9bn Deal With Flagged Irregularities — R2.9 billion
  • Johannesburg Insolvency: JSE Suspends City Bonds as Metro Owes R25bn — R25.2 billion (owed)
  • Water Crisis: Half of Wastewater Systems Critical, R1.76bn in Material Irregularities — R1.76 billion (AGSA confirmed losses)
  • Eskom Kusile/Matla: SIU Freezes R76.5m in Properties and Vehicles — R76.5 million (preserved)
  • Free State Premier Bursary Scandal: R8.3m Irregular, Bursary Paid to a Dead Student — R8.3 million
  • Madlanga Commission: Investigating the Capture of the Criminal Justice System — 2025
  • National PERSAL Ghost Worker Fraud: R3.9 Billion Per Year Draining Public Payroll — R3.9 billion per year
  • IDT CEO Tebogo Malaka: Allegations of Tender Kickbacks and Attempted Journalist Bribery — 2025
  • KZN School Nutrition Ghost Companies: R2.9 Billion Tender Compromised by Phantom Firms — R2.9 billion
  • Emalahleni R650M Environmental Fine: Largest Ever on a South African Municipality — R650 million
  • Mchunu Placed on Leave of Absence: Madlanga Commission Investigates Mkhwanazi Allegations of Syndicate Infiltration — 2025
  • SASSA Insider Fraud Syndicates: R265 Million+ Stolen from Beneficiaries — R265 million+
  • McKinsey Africa $122.85 Million Settlement: Eskom and Transnet Bribery Resolved — R2.2 billion
  • Mhlathuze Water R37M Fraud: CEO Arrested, 14 Accused, Dudu Myeni Forced Off Board — R37 million
  • Modimolle-Mookgophong: Adverse Audit, 2 Weeks Without Water, Residents Demand Administration — 2024
  • SASSA Post Office Payment Crisis: Millions of Beneficiaries Losing Access — Incalculable (millions of beneficiaries at risk)
  • ACSA R544M+ Irregular Expenditure: R40M Overpayment, R3-6B Smart Security Tender Cancelled — R544 million+
  • Madibeng Municipality: R2 Billion Debt, Deliberate Water Contamination for Tanker Contracts — R2 billion
  • Makhado (Louis Trichardt): Dams 90.5% Full But Residents Have No Water — Sheriff Seizes Vehicles — 2024
  • Nkomazi Municipality: Councillors Withhold Water to Sell via Tankers — Politician Shot for Exposing Scheme — 2024
  • NHFC Governance Collapse: CEO Suspended, Board Expired, Only 39% Targets Met — 2024
  • Ramotshere Moiloa (Zeerust): Municipal Manager Arrested, Shooting at Municipal Offices — 2024
  • Beaufort West: South Africa's Oldest Municipality, 77% Water Losses, Gamka Dam at 14% — 2024
  • SABC Signal Crisis: R3.2B Bailout Failed, Digital Migration 15+ Years Late, Blackout Threat — R3.2 billion
  • Ekurhuleni Municipal Collapse: R300M Office Refurb Budgeted at R46M (551% Overrun) — R300 million
  • Msukaligwa (Ermelo): Guilty on 8 Counts Water Pollution, 66% Water Loss, Court Order Ignored — 2024
  • Tokologo Municipality: SIU Proclamation 162 of 2024, Under Section 139 Administration — 2024
  • ARC Irregular Expenditure: R256.4M and Qualified Audit — R256.4 million
  • Dipaleseng (Balfour): R160M Environmental Fine for Six Years of Sewage Spills — R160 million
  • Mapisa-Nqakula: Speaker of Parliament Charged with R4.5M in Defence Bribes — R4.5 million
  • Water Tanker Mafias: R2.32B Infrastructure Sabotage-for-Profit — R2.32 billion
  • iLembe District: R100M+ Lost to Water Leaks Annually, 40% Lack Reliable Water — R100 million+/year
  • Home Affairs Immigration Corruption: R181M+ Visa-Selling Syndicate — R181 million
  • Mogale City/Krugersdorp Illegal Mining Crisis: 30,000 Zama-Zamas, 200 Syndicates, SANDF Deployed — 2024
  • Taxi Industry: R90B/Year Economy, 300+ Killings/Year, State-Enabled Lawlessness — R90 billion/year
  • Rand Water R27B Infrastructure Backlog: Vaal System Under Strain, 46% Water Lost — R27 billion
  • Ga-Segonyana Municipality: Kuruman Weeks Without Water, Mayor No-Show — 2024
  • Musina Municipality: Sewage in Limpopo River, 80% Roads Need Overhaul — 2024
  • Johannesburg Water Crisis: R4 Billion Diverted, 86-Hour Cuts, Infrastructure Collapse — R4 billion

Die Sake

Gedokumenteerde Korrupsie

Laai sake...

R5.5 trillion

Social Grant Fraud2026

NSFAS Fraud Arrests: Eleven in Court Over Shell-Company Diversions

DocumentedRamaphosa EraProsecution

1 instelling1 bron
COVID-19 Corruption2026

SIU UIF-TERS Crackdown: R27m+ Preserved, Convictions Across Provinces

ProvenRamaphosa EraConvicted & Sentenced

R27 million+ (preserved/recovered)

2 bronne
Tender Fraud / Procurement2026

Durban High Court Sets Aside R7bn KwaZulu-Natal Tender as Unlawful

DocumentedRamaphosa EraInvestigation

R7 billion (contract value)

Contract Value
1 bron
Justice System Obstruction2026

Police Infiltration Scandal: Parliament Finds "Serious Institutional Crisis"

DocumentedRamaphosa EraInquiry

2 persone2 instellings1 bron
Transport Corruption2026

PRASA "Tall Trains" Fallout: SARS Links Montana to R30m From Locomotive Contractor

ReportedRamaphosa EraInvestigation

R30 million+ (SARS-traced)

1 persoon1 instelling1 bron
Tender Fraud / Procurement2026

National Lotteries Commission: ~R2bn "Good Causes" Looting Probe

DocumentedRamaphosa EraInvestigation

R2 billion (alleged)

1 instelling1 bron
Tender Fraud / Procurement2026

SAPS Medicare24 Tender: R360m Police Health Contract Prosecution

DocumentedRamaphosa EraProsecution

R360 million

Contract Value
2 persone3 instellings2 bronne
State Capture2026

Vincent Smith: First Bosasa/Zondo State Capture Conviction — 7 Years

ProvenRamaphosa EraConvicted & Sentenced

R28 million

bribery_kickbacks
1 bron
Justice System Obstruction2026

Phala Phala: ConCourt Reopens Impeachment as Ramaphosa Goes to Court to Stop It

ProvenRamaphosa EraInquiry

1 persoon3 bronne
Tender Fraud / Procurement2026

Nine Arrested in Eastern Cape Multimillion-Rand Tender Fraud

DocumentedRamaphosa EraProsecution

Multimillion-rand (exact figure not yet public)

1 bron
Financial Sector Corruption2026

VBS Accountability: IRBA Permanently Strikes Off KPMG Auditor Sipho Malaba

ProvenRamaphosa EraDisciplinary

R1.6m fine + ~R9.2m costs

1 instelling1 bron
Tender Fraud / Procurement2026

Tshwane Security Contract: R2.9bn Deal With Flagged Irregularities

ReportedRamaphosa EraInvestigation

R2.9 billion

Contract Value
1 persoon1 instelling1 bron
Municipal Collapse2026

Johannesburg Insolvency: JSE Suspends City Bonds as Metro Owes R25bn

DocumentedRamaphosa EraNo Action

R25.2 billion (owed)

Hidden Liability
1 persoon1 instelling1 bron
Municipal Collapse2026

Water Crisis: Half of Wastewater Systems Critical, R1.76bn in Material Irregularities

DocumentedRamaphosa EraInvestigation

R1.76 billion (AGSA confirmed losses)

1 bron
SOE Looting2026

Eskom Kusile/Matla: SIU Freezes R76.5m in Properties and Vehicles

DocumentedRamaphosa EraCivil Recovery

R76.5 million (preserved)

1 instelling1 bron
Social Grant Fraud2026

Free State Premier Bursary Scandal: R8.3m Irregular, Bursary Paid to a Dead Student

DocumentedRamaphosa EraCivil Recovery

R8.3 million

1 instelling1 bron
Justice System Obstruction2025

Madlanga Commission: Investigating the Capture of the Criminal Justice System

DocumentedRamaphosa EraInquiry

3 persone3 instellings2 bronne
Ghost Workers/Beneficiaries2025

National PERSAL Ghost Worker Fraud: R3.9 Billion Per Year Draining Public Payroll

DocumentedRamaphosa EraInvestigation

R3.9 billion per year

1 persoon2 instellings7 bronne
Tender Fraud / Procurement2025

IDT CEO Tebogo Malaka: Allegations of Tender Kickbacks and Attempted Journalist Bribery

ReportedRamaphosa EraInvestigation

1 persoon1 instelling1 bron
Ghost Workers/Beneficiaries2025

KZN School Nutrition Ghost Companies: R2.9 Billion Tender Compromised by Phantom Firms

DocumentedRamaphosa EraInvestigation

R2.9 billion

Contract Value
1 instelling2 bronne
Municipal Collapse2025

Emalahleni R650M Environmental Fine: Largest Ever on a South African Municipality

ProvenRamaphosa EraCivil Recovery

R650 million

1 instelling1 bron
Intelligence Abuse2025

Mchunu Placed on Leave of Absence: Madlanga Commission Investigates Mkhwanazi Allegations of Syndicate Infiltration

DocumentedRamaphosa EraInquiry

2 persone2 bronne
Social Grant Fraud2025

SASSA Insider Fraud Syndicates: R265 Million+ Stolen from Beneficiaries

DocumentedRamaphosa EraProsecution

R265 million+

2 instellings4 bronne
State Capture2024

McKinsey Africa $122.85 Million Settlement: Eskom and Transnet Bribery Resolved

ProvenRamaphosa EraAdmitted. Noted. Cleared.

R2.2 billion

1 instelling1 bron
Tender Fraud / Procurement2024

Mhlathuze Water R37M Fraud: CEO Arrested, 14 Accused, Dudu Myeni Forced Off Board

DocumentedRamaphosa EraProsecution

R37 million

1 persoon1 instelling1 bron
Municipal Collapse2024

Modimolle-Mookgophong: Adverse Audit, 2 Weeks Without Water, Residents Demand Administration

DocumentedRamaphosa EraNo Action

1 instelling1 bron
Social Grant Fraud2024

SASSA Post Office Payment Crisis: Millions of Beneficiaries Losing Access

DocumentedRamaphosa EraNo Action

Incalculable (millions of beneficiaries at risk)

Economic Impact
1 persoon3 instellings3 bronne
Tender Fraud / Procurement2024

ACSA R544M+ Irregular Expenditure: R40M Overpayment, R3-6B Smart Security Tender Cancelled

DocumentedRamaphosa EraInvestigation

R544 million+

1 instelling1 bron
Municipal Collapse2024

Madibeng Municipality: R2 Billion Debt, Deliberate Water Contamination for Tanker Contracts

ReportedRamaphosa EraNo Action

R2 billion

Hidden Liability
1 instelling2 bronne
Municipal Collapse2024

Makhado (Louis Trichardt): Dams 90.5% Full But Residents Have No Water — Sheriff Seizes Vehicles

DocumentedRamaphosa EraNo Action

1 instelling1 bron
Municipal Collapse2024

Nkomazi Municipality: Councillors Withhold Water to Sell via Tankers — Politician Shot for Exposing Scheme

ReportedRamaphosa EraNo Action

1 instelling1 bron
Cadre Deployment2024

NHFC Governance Collapse: CEO Suspended, Board Expired, Only 39% Targets Met

DocumentedRamaphosa EraNo Action

1 instelling1 bron
Municipal Collapse2024

Ramotshere Moiloa (Zeerust): Municipal Manager Arrested, Shooting at Municipal Offices

DocumentedRamaphosa EraProsecution

1 instelling1 bron
Municipal Collapse2024

Beaufort West: South Africa's Oldest Municipality, 77% Water Losses, Gamka Dam at 14%

DocumentedRamaphosa EraNo Action

1 instelling1 bron
SOE Looting2024

SABC Signal Crisis: R3.2B Bailout Failed, Digital Migration 15+ Years Late, Blackout Threat

DocumentedRamaphosa EraNo Action

R3.2 billion

1 instelling2 bronne
Municipal Collapse2024

Ekurhuleni Municipal Collapse: R300M Office Refurb Budgeted at R46M (551% Overrun)

DocumentedRamaphosa EraNo Action

R300 million

1 bron
Municipal Collapse2024

Msukaligwa (Ermelo): Guilty on 8 Counts Water Pollution, 66% Water Loss, Court Order Ignored

ProvenRamaphosa EraConvicted & Sentenced

1 instelling1 bron
Tender Fraud / Procurement2024

Tokologo Municipality: SIU Proclamation 162 of 2024, Under Section 139 Administration

DocumentedRamaphosa EraInvestigation

1 instelling2 bronne
Land Reform Fraud2024

ARC Irregular Expenditure: R256.4M and Qualified Audit

DocumentedRamaphosa EraInvestigation

R256.4 million

3 instellings2 bronne
Municipal Collapse2024

Dipaleseng (Balfour): R160M Environmental Fine for Six Years of Sewage Spills

ProvenRamaphosa EraCivil Recovery

R160 million

1 instelling1 bron
Tender Fraud / Procurement2024

Mapisa-Nqakula: Speaker of Parliament Charged with R4.5M in Defence Bribes

DocumentedRamaphosa EraProsecution

R4.5 million

bribery_kickbacks
2 instellings1 bron
Infrastructure Theft2024

Water Tanker Mafias: R2.32B Infrastructure Sabotage-for-Profit

DocumentedRamaphosa EraInvestigation

R2.32 billion

7 instellings12 bronne
Municipal Collapse2024

iLembe District: R100M+ Lost to Water Leaks Annually, 40% Lack Reliable Water

DocumentedRamaphosa EraNo Action

R100 million+/year

1 instelling1 bron
Diplomatic Corruption2024

Home Affairs Immigration Corruption: R181M+ Visa-Selling Syndicate

DocumentedRamaphosa EraInvestigation

R181 million

3 persone3 instellings11 bronne
Infrastructure Theft2024

Mogale City/Krugersdorp Illegal Mining Crisis: 30,000 Zama-Zamas, 200 Syndicates, SANDF Deployed

DocumentedRamaphosa EraInvestigation

1 instelling1 bron
Transport Corruption2024

Taxi Industry: R90B/Year Economy, 300+ Killings/Year, State-Enabled Lawlessness

DocumentedRamaphosa EraNo Action

R90 billion/year

Economic Impact
2 bronne
Infrastructure Theft2024

Rand Water R27B Infrastructure Backlog: Vaal System Under Strain, 46% Water Lost

DocumentedRamaphosa EraNo Action

R27 billion

Hidden Liability
1 instelling2 bronne
Municipal Collapse2024

Ga-Segonyana Municipality: Kuruman Weeks Without Water, Mayor No-Show

ReportedRamaphosa EraNo Action

1 instelling2 bronne
Municipal Collapse2024

Musina Municipality: Sewage in Limpopo River, 80% Roads Need Overhaul

ReportedRamaphosa EraNo Action

1 instelling1 bron
Municipal Collapse2024

Johannesburg Water Crisis: R4 Billion Diverted, 86-Hour Cuts, Infrastructure Collapse

DocumentedRamaphosa EraNo Action

R4 billion

1 bron

1–50 of 274